The North Gallery Road is closed at Sector 20 for LCLS construction
for the next six months. The North Access Road that begins at Sector 20
is now the main roadway to access any part of the accelerator west of
Sector 20 along the north side of the Gallery. Everyone that uses this
road needs to be aware that this route will be more heavily used during
LCLS construction and the October downtime. Recreational users should
especially take care to not obstruct the roadway during this time.
When walking or cycling, please be prepared to yield so that vehicles
can pass safely.